top of page

CONSTRUCTION TIME-LAPSE CAMERAS AND SERVICE

Time-lapse filming for construction site security and progress tracking.

Improve project management and boost marketing.​​

Construction Site
  • 4K Video AI enhancement

  • Unlimited photo storage​

  • Live View construction

  • Mobile application

  • BIM & BI integration

TIMELAPSE CENTER

Why Time-Lapse Your Project?

01

02

03

04

Reporting – Control deadlines and monitor the quality of work.

Marketing – Create engaging videos for clients and experts.

PR – Showcase the project to investors.

Disputes and Inspections – Record the progress of construction to resolve disagreements.

Industrial Construction Site

Time-Lapse photography involves capturing images of a subject from a consistent angle and over set intervals. These images are then seamlessly merged into a video clip, vividly showcasing the rapid changes at a construction site an extended period. In our service, we craft timelapses from individual photos, maintaining impeccable image quality throughout. Leveraging artificial intelligence, we merge these photos to guarantee high-quality films.

White Wall with Stairs

PROFESSIONAL TIME-LAPSE FILMING

Capturing construction progress is different from regular timelapse. Making a film has features that need to be considered. Our studio and AI-developers have created their own approach to creating long term time-lapses, which makes their quality unique.

Key advantages of our service:

  1. Classification of day and night photos.

  2. Stabilization of each video frame.

  3. Detection and extraction of bad images.

  4. Cinema-style color enhancements.

  5. Brightness smoothing - AI Smart Dkflicker.

  6. Flexible settings for time-lapse film composer.

Just look at the difference between the raw footage and our time-lapse post-processing

OUR WORKS:

1

Casesone

CONSTRUCTION TIME-LAPSE SHOWREEL 2025

We manage projects from the beginning to the end. We look for the best places to install cameras on the construction site. We install solar-powered cameras. We use 4G to transmit photos. We go to the construction site for aerial photography. We do 3D photogrammetry of the 3D model of the building and integration with BIM. We create report video presentations about construction.

2

ART MUSEUM CONSTRUCTION

2 year in 1 minute

We set up a professional high resolution time-lapse camera 24MP. The camera, powered by solar panels for an entire year, supplied the client with real-time photos via a 4G network.

Project duration: 2 year

3

COTTAGE CONSTRUCTION IN VILENPARK, GERMANY

1 year in 1 minute

Our initial venture into frame-by-frame filming of a cottage in Germany was deemed a success by the client's management team. Our specialized cameras facilitated a faster construction process by offering a streamlined monitoring system. We compiled a comprehensive photo archive documenting every construction phase and produced a frame-by-frame presentation film, which contributed significantly to the rapid sale of the cottage.

Project duration: 1 year

Construction monitoring

Comprehensive photo archive allows you to effortlessly revisit any specific stage of the project, giving you instant insight into what was happening on construction site at any given moment. Thanks to our automatic time-lapse cameras, there's no need to sift through hours of footage. In just few minutes, you can experience a week's worth of events, making project monitoring both efficient and convenient.

comparison of construction stages
building information modeling

Construction presentation

Create custom setings or use automatic time-lapse films to showcase and promote your construction project. Time-Lapses are proven to captivate clients and customers, whether shared on social media or displayed at offline events. They're an eye-catching tool that effectively highlights your project's progress and appeal.

Features

EXPERT SOLUTIONS FOR CONSTRUCTION TEAMS

Our software developers are dedicated to constantly improving our online service, taking cues from the valuable experiences of civil construction engineers. This commitment to user feedback has led to the creation of a highly versatile platform, uniquely equipped to handle challenges on construction sites of any scale and complexity.

construction site monitoring

UNLIMITED PHOTO ARCHIVE

The service stores high-resolution photos for the entire duration of your construction project. With intuitive Timeline and Calendar tools, you can effortlessly travel back in time to view the status of your construction site at any given moment, like a year ago. The digital zoom feature allows you to observe even the smallest details with clarity. Plus, this comprehensive archive remains accessible long term after your project's completion, ensuring you have a lasting record of every stage.

risk management

STAGE COMPARISON

With Compare tool, effortlessly visualize the transformations at your site by superimposing two images. This feature enables you to closely examine and contrast specific segments of these images with a digital zoom function. It's also compatible with 3D panoramas captured by drones, offering a comprehensive view of your project's progress.

UNIFIED CAMERAS INTERFACE INTEGRATION

Our service enables integration of various CCTV and time-lapse camera types from different sites and locations. You can organize these cameras based on multiple criteria and pinpoint their locations on a geographical map. Additionally, it's possible to assign specific access rights to each team member, enhancing security and collaboration. Our platform also offers a customizable notification system, tailored to meet your unique project needs.

timelapse-soft-web.webp
timelapse-app-page

The service not only captures images from camera installation sites but also collects weather data, recording it alongside each photo. This feature enables you to monitor and assess the feasibility or compliance of work conducted under specific weather conditions.

WEATHER MONITORING

Our platform allows you to effortlessly annotate your photos with text or graphics and share them with interested parties in just one click. Additionally, you have the option to organize select images in the 'Favorites' section, facilitating collaborative discussions and reviews.

SHARE PHOTOS

timelapse-app-page

AUTOMATED TIME-LAPSE CREATION

Every day, our service automatically creates four types of time-lapse videos: a daily recap of the last 24 hours, a weekly overview of the past seven days, a monthly summary, and a comprehensive view of the entire construction period. These videos provide a straightforward way to monitor work progress, ensure adherence to safety protocols, and assess equipment usage on site. Additionally, our flexible settings enable you to customize timelapses for specific days and hours, allowing you to focus on the most relevant time periods and exclude any unnecessary intervals.

timelapse-app-page

PROMOTIONAL CONTENT

The time-lapses and photos play a crucial role in promoting your project. It's essential for your marketing and PR teams to have easy access to this content at all times. Our service offers unrestricted access to top-notch materials, perfect for social media and promotional campaigns.

timelapse-app-page
timelapse-app-page

SUPPORT FOR ANY MEDIA FORMATS

Our service offers the ability to upload and categorize a wide range of materials: photos captured by operators or engineers, drone footage, video clips, and 3D panoramas. This feature allows for the consolidation of your entire media archive from the construction site into one centralized location.

Stage Comparison

STAGE COMPARISON

Light and Shadow
Live Streaming

LIVE STREAMING WINDOW
FOR YOUR WEBSITE

Time-Lapse Center: An Easy and User-Friendly Tool for Integrating Media Content into Your Website. With our service, you can embed a module featuring video streams, photo archives, time-lapse videos, and a curated photo collection onto your site in just a minute, using a simple link. This 'window' allows you to showcase all your project cameras, granting you and your clients full access to all materials from your site.

Sample Broadcast Player Integration:

EASY INTEGRATION OF YOUR CAMERA WITH OUR SERVICE

1

Leave an application

Your personal account manager will contact you to set up access to the service.

2

Connect your camera to the service

Our technician will configure the equipment to connect to the service.

3

Use the service features

Your dedicated personal manager is available 24/7 to offer support and guidance on the system.

EXPLORING THE USE OF OUR SERVICE

Reach Out to Our Manager

We'll Assist You in Selecting the Perfect Camera Kit
for Your Project

panorama-180-timelapse-cctv-camera

FAQ

There was a technical issue on our end. Try again or refresh.
bottom of page